Multi-use path on the Gordie Howe International Bridge grand opening (Wed. Aug. 05, 2026) Detroit

Multi-use path on the Gordie Howe International Bridge

0
12

 

The Gordie Howe International Bridge finally opened!

It’s the longest cable-stayed bridge in North America. The bridge directly links Interstate 75 in Detroit with Highway 401 in Windsor, creating a seamless freeway-to-freeway international connection.

The bridge has: six traffic lanes (three in each direction), 216 stay cables, two 722-foot towers, and there are no support piers in the Detroit River, allowing ships to pass unobstructed.

And now they are officially opening the multi-use path for pedestrians and cyclists.

There is no toll for pedestrians or cyclists using the multi-use path. (However, motor vehicles do pay a bridge toll.)

The bridge crossing is approximately 1.5 miles long.

Because this is an international border crossing, you must carry valid travel documents (such as a passport or other acceptable border identification) and pass through customs and immigration on both sides.

What:           Multi-use path on the Gordie Howe International Bridge Grand Opening

When:          Wednesday, August 05, 2026

Where:         Gordie Howe Bridge (Detroit, USA and Windsor, Canada)

Time:           8:00 a.m. – 8:00 p.m.

Cost:            Free

Homepage

https://gordiehoweinternationalbridge.com/

Facebook

https://www.facebook.com/GordieHoweBridge

 

Multi-use path on Detroit’s Gordie Howe International Bridge